Electrical application and permit projects play an important role as the official documents and plans required to design, install and operate a structure's electrical wiring. These projects ensure the creation of a safe, properly functioning and standards-compliant electrical system. Here are the general steps of electricity application and license projects:
Installation Design: The first step is to determine the electrical needs of the building and to design an electrical installation suitable for these needs. At this stage, elements such as socket locations, lighting points, main panels, fuse panels and cable routes are planned.
Project Preparation: An official electrical project including the design of the installation is prepared. This project is carried out by electrical engineers or specialists. The project includes the materials to be used, cable sections, fuse types, grounding system and other technical details.
License Application: You have to submit the prepared project to the relevant municipality or authorized institution in order to apply for a license. When submitting the project, you may need to provide information such as the building's characteristics, intended use, and electrical needs.
Licensing: The municipality or the relevant institution examines the project and gives the electricity license when it finds it appropriate. The license is a confirmation that the project complies with the standards and will be carried out in accordance with the law.
Material Supply: After obtaining the license, you can procure the materials specified in the project. Using quality, standards-compliant and reliable materials ensures the safety and efficiency of the installation.
Installation Application: The physical installation of the electrical installation is carried out at this stage. Operations such as cable laying, socket and switch assembly, installation of panels are carried out. At this stage, occupational safety and quality control are important.
Test and Check: After the installation of the installation is completed, its functionality and safety are tested. Various checks such as circuit breaker tests, insulation tests and grounding tests are performed.
Approval and Commissioning: After making sure that the installation has passed all tests and is working safely, approval can be obtained by the relevant authority. At this stage, the installation is officially put into operation.